How We Work

Clear scope, clear responsibilities and clear payments, so there are no surprises.

What Grey Structure Includes

A complete list of what is covered and what is not.

Covered
  • Site marking and levelling
  • Excavation
  • Foundation, PCC and footings
  • Backfilling with machine compaction
  • DPC (damp-proof course)
  • All RCC: columns, beams, lintels, slabs, stairs, mumty and parapet
  • Sunshades
  • Complete brickwork
  • Complete plaster
  • Water pipes and electrical conduits laid (rough-in)
  • Underground water tank, overhead tank, septic tank and rainwater tank
  • Fitting of gates, frames and grills you supply
  • Shuttering, curing and site supervision
  • Final site cleaning
Not covered
  • Floor and wall tiles
  • Ceiling work
  • Paint
  • Doors, windows and woodwork
  • Kitchen cabinets
  • Bathroom fixtures, lights, fans and switches
  • Boundary wall and main gate (quoted separately)
  • Solar system
  • Map approval and design

Who Does What

Choose how you want to work with us.

We provide
  • Skilled labour and supervision
  • Tools and machinery: mixer, vibrator, compactor, water pump, cutting machine, scaffolding
  • Site CCTV for your monitoring
You provide
  • All building material: cement, steel, bricks, sand, gravel
  • Plumbing and electrical material
  • Gates, frames and grills
  • Water and electricity on site
  • Approved drawings and payments on schedule

Material Specifications

The materials and finishes behind each of our packages.

Grey Structure Materials
Cement
Good-quality branded cement
Steel
Graded reinforcement steel
Bricks
Well-burnt first-class bricks
Sand
Clean, washed sand
Crush & Aggregate
Clean crushed stone, proper size
Pipes
Pressure-rated water and conduit pipes
Shuttering
Steel shuttering
Basic Finishing
Style
Functional, clean and practical
Paint
Quality emulsion paint
Flooring
Standard tiles
Windows
Aluminium or UPVC
Doors
Wooden doors, solid main door
Kitchen & Fixtures
Standard cabinets and mid-range fixtures
Premium Finishing
Elevation
Decorative elevation finishing
Flooring
High-end tiles
Kitchen
Upgraded fittings and cabinets
Living Space
Media wall with feature tiles
Bedrooms
Bed feature walls
Wardrobes & Lighting
Built-in wardrobes, designer lighting
CementCement
SteelSteel
BricksBricks
SandSand
Ravi sandRavi sand
CrushCrush
Aggregate (bajri)Aggregate (bajri)
Water pipesWater pipes
Conduit pipesConduit pipes
ShutteringShuttering
Site camera systemSite camera system

Our Quality Standards

The standards we follow on every site.

Machine-mixed concrete

Concrete and mortar are mixed in a mixer machine only, never by hand.

Vibrator on all RCC

A concrete vibrator is used on all structural concrete for strength.

Compacted backfilling

All filling is compacted by machine, not left loose.

Tested plumbing

Water lines are pressure- and leak-tested and shown to you before approval.

Proper curing

RCC, plaster and brickwork are cured properly for lasting results.

Built to approved drawings

Work follows your approved drawings, engineer instructions and society rules.

Machinery we bring
Concrete mixerConcrete vibratorCompactor / rammerWater pumpCutting machineScaffolding

Pay As Work Progresses

Payments follow the stages of your project, after each stage is checked.

1
Advance

To start and mobilise the team.

2
Excavation and foundation

Paid when the foundation is complete.

3
Ground floor roof

Paid after the ground-floor slab is done.

4
First floor roof

Paid after the first-floor slab is done.

5
Grey structure complete

Paid after joint measurement and checking.

6
Handover

Final payment after tests and fixing any defects.

What You Can Expect

Site CCTV

Watch your site online while construction is running.

Extra work in writing

Any extra work is priced and approved in writing before it starts.

Clear payment trail

Payments by cheque or bank transfer, so everything is on record.

Worker safety

Our team's safety on site is our responsibility.

Frequently Asked Questions

In labour-only, you buy all material and we provide labour, tools and supervision. With materials, we supply the material too, and you approve brands and samples first.

Everything from site marking and foundation to RCC, brickwork, plaster and water tanks. Finishing such as tiles, paint and fixtures is separate. See the full list above.

We tell you the price first and start only after your written approval (WhatsApp or email is fine).

Yes. We install CCTV on site and give you access during construction, where internet is available.

It depends on the plot size, the design and the contract type. We agree a written schedule with you before work starts.

In stages as work is completed and checked, by cheque or bank transfer.

Building a house? Get our free checklist

The 15 checks every owner should do before and during grey structure construction. In English and Urdu.

Get the Free Checklist

Ready to start your project?

Tell us about your plan and our team will get back to you shortly.